Investors asking what Trojena property costs usually expect a price per square metre. Based on our research, no such verified public figure exists, and eligibility for a specific parcel is a separate question from national ownership rules. This article shows what can be verified as of October 2026, what remains unknown and how to build a cost model that does not rely on marketing numbers. The sections follow the order in which an offer should be tested: project status, eligibility, price evidence, full costs, holding costs, delay risk and pre-payment checks.
Trojena real estate investment cannot currently be budgeted from a verified public residential price list identified in this research. As of October 2026, assess any offer through documented ownership eligibility, project status and contractual terms. Separate the purchase price from applicable taxes, professional fees, operating costs and reserves for delays.
Trojena in 2026: Plans and Verified Milestones
Trojena is a mountain destination within the NEOM development in Tabuk Province, announced under Saudi Vision 2030 and backed by the Public Investment Fund (PIF). Announced is not the same as delivered — here’s the difference: an announcement states an intention, while a milestone is a dated event that a regulator, owner or contractor has disclosed. The research cutoff for this article is 28 October 2026, and any current milestone not listed below was not verified.
What was originally announced
PIF’s 2022 announcement of Trojena included a 2026 completion target. As of October 2026, our research did not identify evidence that this target was achieved, so it should be read as a historical plan. Visitor and resident figures published alongside such announcements are targets, not measured demand, and they say nothing about occupancy in a particular unit.
What later evidence changes
Two 2026 events weaken any reliance on the original schedule. In January 2026, AP reported that the planned 2029 Asian Winter Games had been postponed. On 25 March 2026, Webuild disclosed termination for convenience of its three-dam and The Bow construction package, effective 29 March 2026. The roughly 30% completion figure attached to that disclosure referred to the Webuild package only, not to the whole destination.
| Date | Issuer | What was stated | What it establishes | What it does not establish |
|---|---|---|---|---|
| 2022 | PIF | Trojena announced with a 2026 completion target | An original delivery intention | That the target was met |
| January 2026 | AP (secondary reporting) | Planned 2029 Asian Winter Games postponed | The original event date is no longer reliable | A replacement date or any rental demand |
| 25 March 2026 (effective 29 March 2026) | Webuild | Termination for convenience of the three-dam and The Bow package | Material delivery uncertainty for that package | Destination-wide progress, or cancellation of every component |
Package-level progress is not destination-wide progress. A contractor’s completion percentage describes one scope of work, and a termination of one package does not prove that other components are cancelled. What this means for investors in practice: treat any brochure that cites the 2026 target or the Games as describing a past plan unless the seller supplies a dated, current delivery schedule.

Editorial illustration, not a photograph of any construction or completed development. Alt text: A real estate adviser and two clients review a site plan overlooking rugged mountain terrain.
Can Foreign Investors Acquire Trojena Property?
The Real Estate General Authority (REGA) confirmed that the updated non-Saudi ownership framework under the Law of Real Estate Ownership by Non-Saudis took effect on 22 January 2026. You can check the current framework on the REGA website. That is a national effective date. National eligibility does not establish eligibility for a specific Trojena parcel, buyer or property right. A common misunderstanding we see is treating the national law as a green light for any project marketed to foreigners.
Buyer eligibility and the exact geographic zone
REGA’s current service page directs users to geographic controls through the Saudi Properties portal. This research has not verified Trojena parcel-level eligibility, so we cannot say that all foreigners can buy in Trojena, and we cannot say that every foreign purchaser is excluded. The answer depends on the exact zone, the buyer category and the right being offered. We recommend checking the following, in order:
- The exact parcel or unit identifier, matched to the seller’s documents rather than a project name.
- The geographic zone of that parcel, tested against the controls shown through the Saudi Properties portal and current REGA information.
- The buyer category: an individual, a company or another entity, each of which may be treated differently.
- The permitted right: full ownership, usufruct rights or another interest, and the duration of that right.
- The registration route and the authority that will record the right in the buyer’s name or the buyer’s entity’s name.
- Written confirmation from a Saudi-qualified lawyer that items 1 to 5 apply to this buyer and this property as of the date of signing.
Ownership versus usufruct rights
Ownership transfers the property right itself. Usufruct rights grant use and benefit for a defined period and do not amount to ownership of the land. The distinction affects financing, resale and what the investor holds when the period ends. If a seller describes an interest loosely as “ownership”, ask for the legal title or right document and its term.
Individual purchase, corporate participation and residency are three separate questions. A company taking part in a project through a contract is not the same as a retail buyer purchasing a unit, and a corporate contract does not prove retail access. Buying property does not by itself grant residency, so any residency expectation must be tested against current official residency rules, not inferred from a purchase.
Trojena Property Prices: What Can Be Verified?
As of October 2026, this research identified no authoritative public Trojena residential price schedule. This is a research limitation, not proof that no private agreement exists. It does mean that a quoted “starting price” should be classified by its evidence before it enters a budget.
| Evidence type | Acceptable proof | Permitted conclusion |
|---|---|---|
| Authorised quotation | Dated, signed unit quotation from a seller whose authority over the exact unit is documented | A price for that unit on those terms, valid for the stated period |
| Intermediary asking price | A broker’s message or listing, with the broker’s licence and the owner’s written authority | An unverified opening position, not a market price |
| Construction budget | A published project or contract value | The cost of building works; it is not a residential sale price |
| Hypothetical model | An editorial or investor assumption labelled as such | Arithmetic only, with no market conclusion |
Acceptable proof always links a price to a unit, a seller, a date and a payment schedule. Without those four items, a number is a conversation starter. We have deliberately not inserted entry prices, square-metre ranges, deposits or payment plans in this article, because none could be sourced to an issuing organisation.
Trojena Investment Costs Beyond the Purchase Price
The purchase price is one line in an acquisition budget. The table below separates each cost by calculation basis, who legally pays or who bears it by contract, how well the item is evidenced and when it falls due. Every figure left as unknown is unknown in this research.
| Cost item | Calculation basis | Legal payer or contractual bearer | Evidence status | When payable |
|---|---|---|---|---|
| Purchase consideration | Price stated in the signed contract | Buyer | No verified Trojena price identified | Per contract schedule |
| Real Estate Transaction Tax (RETT) | 5% of taxable consideration, per ZATCA | Statutory liability and economic burden must be checked separately | Rate stated by ZATCA; application to a specific Trojena sale not verified | At transfer, subject to law and contract |
| Separately verified fee | Any fee confirmed by an authority for the exact zone and buyer | To be confirmed | None verified for Trojena | To be confirmed |
| Brokerage | Agreed commission | Contractual | No Trojena figure identified | Per brokerage agreement |
| Legal work | Lawyer’s written fee quote | Buyer, usually | Quote required | Before payment and at closing |
| Translation | Per document quote | Buyer, usually | Quote required | During due diligence |
| Registration-related charges | Official schedule for the relevant registry step | To be confirmed | Not verified for Trojena | At registration |
| Financing | Lender’s written terms | Buyer | Lender appetite for Trojena not established | At drawdown and over the term |
| Furnishing | Itemised quotation | Buyer | Quote required | Before handover or letting |
| Reserves | Buyer’s chosen buffer for delay and repairs | Buyer | Assumption | Held in advance |
Taxes versus negotiated charges
The Zakat, Tax and Customs Authority (ZATCA) states a 5% rate for RETT, and the replacement RETT law took effect on 10 April 2025. RETT is not automatically a buyer surcharge. The person with statutory liability and the person who bears the cost under the contract can differ, so the operative liability, any exemptions and the contract’s allocation should each be verified. The non-Saudi ownership law sets a ceiling on fees, which is different from the fees actually applied in geographically limited areas. We therefore do not publish a universal 7% or 10% Trojena closing-cost rate.
VAT needs the same discipline. We do not add 15% VAT to a residential property sale automatically. Service-level VAT, for example on a brokerage or management invoice, should be checked on that invoice.
An illustrative acquisition budget
The following example is hypothetical and unrelated to any verified Trojena quotation. Assume a taxable consideration of SAR 3,000,000. At 5%, RETT would be SAR 150,000. A figure of SAR 3,150,000 represents consideration plus RETT only if the contract assigns that economic burden to the buyer. It excludes brokerage, legal work, translation, registration-related charges, financing, furnishing and reserves, so it is not an all-in budget.
For planning, define cash required as buyer-borne consideration instalments plus buyer-borne transaction costs, setup costs and reserves. Leave any unquoted item as unknown rather than estimating it, and replace each unknown with a written quotation before comparing offers.
Holding Costs and Rental Break-Even
Holding costs begin at handover and continue whether or not the unit is let. Before relying on rental income, check whether the project and the right being sold permit letting at all, and whether owner-use limits apply. We have not identified a verified Trojena residential rental-yield series, so everything below is scenario arithmetic.
| Cost item | Basis | Likely bearer | Evidence needed |
|---|---|---|---|
| Service charges | Community or building schedule | Owner | Written schedule |
| Utilities | Metered use or fixed fee | Owner or occupier | Written quotation |
| Insurance | Insurer’s premium | Owner | Written quotation |
| Maintenance | Annual repairs | Owner | Written quotation |
| Replacement reserve | Owner’s chosen allowance | Owner | Assumption |
| Management | Fee or share of revenue | Owner | Written agreement |
| Booking or platform costs | Commission or listing fee | Owner | Written terms |
| Rental permission | Authorisation for the intended letting type | Owner | Documented permission |
| Financing | Interest and fees | Owner | Lender’s written terms |
Three measures must be kept apart. Gross revenue is rent or booking income before any deduction. Net operating income (NOI) is gross revenue minus operating expenses, before debt service and investor-specific taxes. Cash flow after debt service is NOI minus loan payments.
Here is a hypothetical SAR model, not a Trojena forecast. Annual gross revenue of SAR 180,000 less SAR 60,000 of operating expenses gives SAR 120,000 NOI before financing and investor-specific taxes. If that NOI were divided by the hypothetical SAR 3,000,000 consideration alone, the ratio would be 4.0%. The denominator excludes transaction costs, and the figure is not return on equity, which depends on how much cash the investor actually contributes. Any real calculation needs documented rent, occupancy and expense figures.
Owner-use reduces lettable nights or months, so revenue falls while many fixed costs stay. Low occupancy has the same effect. Destination visitor targets do not establish occupancy for an individual unit.
Delay, Financing and Exit Scenarios
Given the March 2026 package termination and the postponed Games, delay is a core scenario, not a remote one. We assign no probabilities to the scenarios below. They use only the hypothetical figures stated here, with SAR 5,000 of monthly incremental carrying costs and the SAR 180,000 annual gross revenue assumption from the previous section.
| Scenario | Delay | Incremental carrying costs | Gross revenue postponed | Refund position |
|---|---|---|---|---|
| On time | 0 months | SAR 0 | SAR 0 | Not applicable |
| 12-month delay | 12 months | SAR 60,000 | SAR 180,000 | Depends on contract |
| 24-month delay | 24 months | SAR 120,000 | SAR 360,000 | Depends on contract |
The SAR 5,000 figure should include any finance cost, so do not add financing again on top of it. Postponed revenue is income not earned, not an out-of-pocket cost, and the two should not be summed without saying so.
Refund rights during delay turn on the contract, including a long-stop date and any applicable off-plan escrow arrangement. This research has not verified that such an arrangement exists for Trojena. Resale availability, lender appetite and occupancy data for Trojena are not established by the research either.
Liquidity risk and price risk are different. Liquidity risk is the difficulty of finding a buyer or lender at any price, and price risk is a change in value. We assume neither appreciation nor a functioning secondary market.
Checks Before Paying a Trojena Deposit
The checklist below does not claim that these documents or safeguards already exist for any particular Trojena offer. Each item is something to request and verify before money moves.
- Property identity: the exact unit and parcel identifier, matched to the seller’s documents.
- Seller authority: written proof that the seller may sell or reserve this exact unit.
- Broker licence: evidence that any intermediary is licensed and authorised by the seller.
- Project authorisation: the applicable approval for the project or phase, as confirmed by the relevant authority.
- Ownership eligibility: current written confirmation that this buyer category may acquire this right in this zone.
- Title or right: the document showing what is conveyed, whether ownership or usufruct rights, and for how long.
- Signed price schedule: a dated schedule listing consideration, instalments and who pays each tax or fee.
- Payment recipient: the named account holder, matched to the seller or an authorised escrow agent.
- Off-plan escrow: whether applicable off-plan escrow safeguards exist for this project and how money is released.
- Refund clauses: the conditions, timing and method of refund if the project does not proceed.
- Long-stop date: the latest handover date after which the buyer may exit.
- Rental restrictions: any limits on letting, short stays or owner-use.
- Independent legal review: a Saudi-qualified lawyer, acting for the buyer, reviewing every document before payment.
An expression of interest or a reservation payment does not create registered ownership. We recommend checking that any form you sign states plainly whether it is binding, refundable and revocable.

Editorial illustration of a document review scene. Alt text: Three adults review a floor plan and document folders during a property consultation.
Buy, Participate or Wait for Better Evidence?
Three routes exist in principle, and each has a different evidence standard. The table compares them on proof of access, minimum evidence, cost visibility and exit route. None implies that inventory is available.
| Route | Proof of access | Minimum evidence | Cost visibility | Exit route |
|---|---|---|---|---|
| Direct purchase, if documented and eligible | Authorised quotation and eligibility confirmation for the exact unit | Items 1 to 13 of the deposit checklist | Moderate once a signed schedule exists | Unverified; resale market not established |
| Corporate participation, separately documented | Contract showing the entity’s role and rights | Entity documents, contract terms and legal review | Depends on the contract | Set by contract terms |
| Watchlist approach | None needed | Monitor official disclosures and new dated milestones | Not applicable | No capital committed |
Our assessment, offered as opinion and not as legal advice: while a signed price, a confirmed right and a current delivery schedule are missing, a watchlist is the only route with fully visible costs. Riyadh and Jeddah are mentioned here only as comparisons of evidence quality, because their residential markets generally offer more documented transactions to test an offer against. This is not a statement about their prices or returns.
If you hold an offer and want it reviewed, send us your buyer status, objective, budget range and the documents you have. We assess the paperwork and do not imply access to any unit. You can also find more guides on property-saudi-arabia.com.
Trojena Investment FAQs
How much does property in Trojena cost in 2026?
No authoritative public Trojena residential price list was identified in this research as of October 2026. Treat online starting prices as unverified until supported by an authorised seller’s dated unit quotation. A usable budget also needs the property right, payment schedule, applicable taxes, service charges and contractual allocation of transaction costs.
Can foreigners buy property in Trojena?
Saudi Arabia’s updated non-Saudi ownership framework took effect on 22 January 2026, but national eligibility does not establish access to a particular Trojena property. Confirm the exact geographic zone, buyer category, permitted right and registration requirements through current official information and independent legal review. This research did not verify parcel-specific purchasing eligibility in Trojena.
Is Trojena still being built in 2026?
Trojena’s original completion target should not be treated as a confirmed delivery date. Webuild disclosed termination of its dams and The Bow construction package in March 2026, while the planned 2029 Asian Winter Games had already been postponed. These events establish material delivery uncertainty, but do not prove that every Trojena component has been permanently cancelled.
What taxes and fees should I include in a Trojena investment budget?
Start with the documented consideration and check whether the transaction attracts Saudi Arabia’s 5% Real Estate Transaction Tax. Establish statutory liability and any contractual transfer of the economic burden separately. Add professional, brokerage, financing and setup costs only on a verified basis. Do not assume a nationwide additional foreign-ownership fee automatically applies to Trojena.
Can I estimate rental returns from a Trojena property?
You can build a sensitivity model, but this research did not identify a verified Trojena residential rental-yield series. Label rent, occupancy, operating costs and handover timing as assumptions unless documented. Deduct operating expenses before calculating net operating income, then assess financing separately. Destination visitor targets do not establish demand for a particular rental unit.
What should I check before paying a Trojena property deposit?
Obtain the precise property identification, seller authority, written price schedule, eligibility confirmation and proposed contract before paying. Ask how the payment is held, whether applicable off-plan safeguards exist, and what refund and delay clauses provide. Have an independent Saudi-qualified lawyer review the documents. An expression of interest or marketing brochure does not establish registered ownership.
Key Takeaways for Trojena Investors
As of October 2026, Trojena cannot be budgeted from a verified public price list. Test eligibility for the exact parcel through REGA, confirm tax treatment with ZATCA, and treat the March 2026 Webuild termination and the postponed Games as reasons to model delay. Until a signed price, a confirmed right and a current delivery schedule exist, a watchlist is the lowest-risk position.
Disclaimer: This article is general information based on research as of 28 October 2026. It draws on REGA, ZATCA, PIF and Webuild disclosures and on AP reporting. It is not legal, tax or financial advice, and it makes no promise of returns. Obtain independent Saudi-qualified legal and tax review before making any payment.