Investing in an announced mega-project and buying a documented residential property are two very different things. A mega-project is a plan backed by budgets, renderings and policy goals, while a property purchase requires an identifiable unit, a legal seller, a verified price and a registrable right. Based on our research, most confusion about The Line starts when these two ideas are treated as one. This guide separates what can be verified as of October 2026 from what is still unavailable.

As of October 2026, no verified public apartment price list or residential sales programme for The Line is available. International buyers must distinguish NEOM’s foreign-ownership eligibility from actual properties offered for sale. Saudi Arabia generally applies a 5% real estate transaction tax, while additional fees, ownership restrictions and project-specific costs require verification before any investment commitment.

Property adviser reviewing a linear city architectural model overlooking the Saudi desert

Can International Buyers Invest in The Line?

Our direct assessment as of October 2026 is this: an international buyer cannot currently purchase a verified residential unit in The Line through any publicly established sales programme that we have been able to identify. Interest in NEOM is real, and the legal framework for foreign ownership has changed significantly in 2026, but neither fact creates an apartment that can be bought.

Three layers need to be kept apart. The first is general interest in NEOM as part of Saudi Vision 2030. The second is legal eligibility, meaning whether a non-Saudi may hold a property right in a designated zone. The third is an actual authorised residential listing inside The Line, with a named seller, a defined unit and approved sales documentation. Only the third layer turns an idea into a transaction.

Current purchase availability

Based on our research, no official NEOM residential price list, open reservation programme or registrable apartment inventory for The Line had been published as of October 2026. NEOM’s official project material describes The Line as a component of the long-term NEOM vision rather than presenting a residential sales offer. Third-party reporting during 2026 describes a substantially revised development scope, which makes any purchase claim even more dependent on documentary proof.

Investment exposure to NEOM can also take forms that are not property ownership. These include commercial partnerships and supply contracts, equity in companies operating in NEOM sectors such as Oxagon’s industrial zone, and the state financing provided through the Public Investment Fund (PIF), which owns NEOM. A common misunderstanding we see: an investor reads about a multi-billion-riyal NEOM contract and assumes residential units must be available to private buyers. Those contracts concern construction, energy or technology, not apartment sales.

Question Evidence status (October 2026) What still needs verification
NEOM falls within designated non-Saudi ownership zones Reported in legal and market commentary on the June 2026 geographic framework; map published on the Saudi Properties portal The specific parcel, permitted use and type of right within NEOM
Public apartment price list for The Line Not identified in official sources An official developer price schedule tied to identified units
Open residential sales or reservation programme Not identified An authorised sales channel and approved off-plan documentation
Completed occupiable housing in The Line for private purchase Not evidenced Completion certificates, handover records and registrable titles
Foreign-buyer mortgage products for The Line Not evidenced Written lender confirmation for a specific approved asset

What would prove a listing is genuine

A genuine listing would combine several independent proofs. It would identify the legal seller and developer by commercial registration, show the unit’s precise location and specification, confirm that the parcel sits in a designated zone with a permitted right for non-Saudis, and carry the relevant off-plan sales licence from the Real Estate General Authority (REGA) if the unit is not yet built. Payments would flow through regulated channels rather than personal accounts. A brochure, a video rendering or a WhatsApp message from an intermediary proves none of these points.

The Line NEOM Property Prices and Project Costs

The most frequent error in coverage of The Line Saudi Arabia property prices is mixing three entirely different numbers: the budget for the whole NEOM region, budgets for individual infrastructure packages and the price a private buyer would pay for an apartment. Publicly reported NEOM project budgets are development costs, not apartment selling prices.

Is there an official apartment price list?

No. As of October 2026, we have not identified any official, independently verifiable apartment price list for The Line. We therefore do not publish a price range, a price per square metre or an estimated entry ticket. Any figure circulating online that claims to be a The Line apartment price should be treated as unverified until it is matched to an official developer quotation for an identified unit.

NEOM development expenditure versus purchase prices

When NEOM was announced in October 2017, the headline investment figure was USD 500 billion for the entire region, which also includes Oxagon, Trojena, Sindalah and other areas. Later third-party reporting cited much larger estimates for the overall vision and very large figures for The Line’s first phase alone, alongside reports that the first phase had been cut back. These numbers describe what the state and its partners might spend on land preparation, utilities, transport, structures and public facilities.

A buyer’s price would depend on unit size, specification, payment terms, the type of right granted and the developer’s commercial pricing. None of those variables can be derived from a sovereign development budget. Announced is not the same as delivered — here’s the difference: a budget announcement tells you about intended spending, while a sales price requires a finished product definition and an authorised seller.

The original concept, presented by NEOM in July 2022, described The Line as two parallel mirrored structures roughly 170 kilometres long, 200 metres wide and 500 metres above sea level, intended eventually for about nine million residents. This remains the reference description in most articles, but it is an announced design, not a delivery commitment. Reporting during 2024–2026 describes a far smaller initial phase, widely cited at about 2.4 kilometres.

Figure Applies to Source type Usable as apartment price?
USD 500 billion (2017) Entire NEOM region Official announcement No
Larger total estimates reported later NEOM overall or The Line Third-party reporting No
Phase One construction budgets Infrastructure and structures Third-party reporting, project databases No
170 km, 9 million residents (2022) Original design concept Official announcement No — status revised in later reporting
Verified residential unit prices Individual apartments None identified as of October 2026 Not available

Why price-per-square-metre estimates are unreliable

A price per square metre only means something when there is a defined product and comparable transactions. For The Line, there is no completed residential stock, no recorded resale market and no published developer pricing. Estimates that divide a construction budget by an assumed floor area mix public infrastructure with private units and produce numbers without a legal or commercial basis. We recommend checking any quoted rate against an official quotation for an identified unit before using it in a budget.

Conceptual linear urban development in a desert and mountain landscape

Complete Cost Breakdown for Foreign Buyers

The cost of buying property in NEOM, or anywhere else in Saudi Arabia, has four distinct parts: the acquisition price, immediate transaction cash, financing cash flows and later ownership and exit costs. The table below lists each component a foreign buyer should expect to examine and classifies it by its legal or commercial nature. Classifications describe the nature of each charge, not confirmation that it applies to a specific The Line unit.

Cost item Classification Legal or contractual basis Typical treatment for a foreign buyer
Purchase price Contractual / unverified for The Line Sale contract with an authorised seller Requires an official quotation for an identified unit
Deposit or reservation payment Contractual Reservation or off-plan sale agreement Only payable into a regulated account under approved terms
Real Estate Transaction Tax (RETT) Statutory RETT rules administered by ZATCA, generally 5% of taxable disposals Legally imposed on the disposal; economic burden may be allocated by contract
Fee on dispositions by non-Saudis Statutory, conditional Article 9 of the Law of Real Estate Ownership by Non-Saudis, capped at 5% Rate and liable party must be confirmed in the implementing rules; mainly relevant when a non-Saudi disposes of property
Brokerage commission Negotiable / contractual Brokerage agreement with a REGA-licensed broker Requires a written quotation stating VAT treatment
Legal advice Quoted Engagement with a Saudi-licensed lawyer Fixed fee or hourly quotation
Translation and document certification Quoted Certified translation of identity and corporate documents Varies by document volume
Technical and title due diligence Quoted Engagement with surveyors or consultants Scope-dependent
Registration in the Real Estate Registry Statutory, amount to confirm Registration rules under REGA Confirm current official charges at the time of transaction
Bank transfer charges Contractual Bank tariff Per-transfer fees on sending and receiving sides
Currency conversion Estimated Exchange spread between home currency and SAR Depends on bank or provider; the riyal is pegged to the US dollar
Financing costs Contractual / unverified Lender offer, if any Not evidenced for The Line
Furnishing and fit-out Estimated Buyer’s choice Depends on handover specification
Contingency reserve Estimated Budget prudence Buyer-defined percentage of price

Mandatory taxes and regulatory fees

The Real Estate Transaction Tax (RETT) is generally charged at 5% of the value of a taxable real estate disposal in Saudi Arabia. It is administered by the Zakat, Tax and Customs Authority (ZATCA) and has applied to most real estate disposals since October 2020, when such transactions moved out of the standard VAT regime. Buyers should not add 15% VAT on the property price on top of RETT for a standard sale; VAT may still apply to professional services such as brokerage and legal fees.

Under the RETT rules, the tax attaches to the disposal and the disposing party carries the primary legal obligation, while settlement is generally required before the title transfer can be completed. In practice, sale contracts frequently state that the buyer bears the tax economically. What this means for investors in practice: the question to ask is not only “is RETT due?” but “who does the contract say pays it?” Exemptions exist for defined categories, and their applicability must be checked against the current ZATCA rules for the specific transaction.

The second statutory item is the fee in Article 9 of the Law of Real Estate Ownership by Non-Saudis. The law caps this fee at 5% of the disposition value, but the cap is a ceiling, not an automatic rate. Legal commentary published after the June 2026 implementing regulations reports a fixed 2% fee on disposals by non-Saudi sellers in certain major metropolitan zones such as Riyadh and Jeddah. We have not verified a specific rate for NEOM. Because the fee concerns dispositions by non-Saudis, it is primarily a conditional exit cost for a foreign buyer who later sells, rather than an entry charge.

Professional and financing expenses

Brokerage, legal advice, translation, due diligence and banking charges are commercial costs. Each requires a written quotation from a licensed provider before it is entered into a budget. Saudi brokerage must be performed by a broker licensed by REGA, and commission terms should be documented in a brokerage agreement. Financing costs, if any lender offers a facility, include profit rates under Islamic finance structures, arrangement fees, valuation fees and insurance requirements. For The Line specifically, no foreign-buyer financing product has been evidenced.

Costs that cannot yet be priced for The Line

Several costs cannot be estimated responsibly for The Line as of October 2026: the purchase price itself, deposit size and payment schedule, service charges for a structure of this type, district cooling and utility tariffs, insurance premiums, the type and term of any property right, and the handover specification that determines furnishing costs. A credible budget lists these items as “quotation required” rather than filling them with guesses.

Calculator and architectural model arranged on a desk for property cost planning

Hypothetical Investment Budgets in Saudi Riyals

The three scenarios below use assumed purchase prices of SAR 1,000,000, SAR 2,000,000 and SAR 5,000,000. These are mathematical examples only; they are not actual The Line prices, offers or listings. Their purpose is to show how transaction costs scale and how to build a budget once a genuine quotation exists.

The assumptions are deliberately transparent. RETT is calculated at 5% on the assumption that the transaction is taxable and that the contract allocates the economic burden to the buyer. Brokerage is shown at an illustrative 2.5%. Legal, due diligence and foreign-exchange figures are placeholders, and the contingency reserve is set at 2% of price. Registration is left as a quotation item, and the non-Saudi disposition fee is not added to entry costs.

Line item (SAR) Scenario A (hypothetical) Scenario B (hypothetical) Scenario C (hypothetical) Status
Assumed purchase price (P) 1,000,000 2,000,000 5,000,000 Assumption, not a The Line price
RETT at 5% (T), if taxable and borne by buyer 50,000 100,000 250,000 Statutory rate; allocation by contract
Brokerage at illustrative 2.5% (B) 25,000 50,000 125,000 Assumption; quotation required
Legal advice (L) 15,000 20,000 35,000 Assumption; quotation required
Due diligence and translation (D) 5,000 7,500 10,000 Assumption; quotation required
Bank and FX costs at illustrative 0.5% (X) 5,000 10,000 25,000 Assumption; provider-dependent
Contingency at 2% (C) 20,000 40,000 100,000 Buyer-defined assumption
Registration (R) Quotation required Quotation required Quotation required Confirm official charge
Non-Saudi disposition fee (F) Not applied at entry Not applied at entry Not applied at entry Conditional; confirm rate and liable party
Illustrative total cash required (excluding R) 1,120,000 2,227,500 5,545,000 Arithmetic only
Same total if seller bears RETT 1,070,000 2,127,500 5,295,000 Arithmetic only

The difference between the last two rows shows why tax incidence matters. In Scenario C, the contractual allocation of RETT alone changes the buyer’s cash requirement by SAR 250,000. A seller who agrees to bear the tax may price the unit higher, so buyers should compare total cost rather than headline price.

A reusable formula keeps the logic consistent:

Total cash required = P + T(buyer share) + B + L + D + R + X + C + F(only if confirmed and allocated to the buyer) − M + Fin, where M is any confirmed financing principal and Fin is arrangement, valuation and other upfront financing fees.

For off-plan purchases, this total is not paid at once. The cash needed at signing may be a deposit plus transaction costs, with the balance paid over construction milestones. Annual ownership costs and conditional exit costs, such as a potential disposition fee on resale, sit outside the acquisition total and belong in a separate holding-period model.

Foreign Ownership Rules for The Line

Saudi Arabia foreign property ownership changed fundamentally in 2026. The updated Law of Real Estate Ownership by Non-Saudis entered into force on 22 January 2026, replacing the regime that had applied since 2000. The law was approved by the Council of Ministers in July 2025 and took effect 180 days after publication, as REGA announced. On 23 June 2026, the Council of Ministers approved the implementing regulations and the geographic areas designated for non-Saudi ownership. According to legal commentary, the regulations were published in the official gazette Umm Al-Qura on 3 July 2026.

The law defines a non-Saudi broadly: a natural person without Saudi nationality, a non-Saudi company, a non-Saudi non-profit entity and other foreign legal persons the Council of Ministers designates. Eligibility then differs by category:

  • Resident non-Saudi individuals may own within designated zones and, according to published analysis of the regulations, may also own one residential property for personal use outside the zones, except in Makkah and Madinah.
  • Non-resident non-Saudi individuals are reported to be confined to the designated zones and must first obtain a Saudi digital identity through a Saudi embassy or consulate.
  • Non-Saudi companies may acquire rights within designated zones subject to the conditions for their category and the permitted uses in each zone.
  • Saudi-incorporated companies with foreign shareholders follow separate rules, including purpose-based ownership outside zones in some cases, with stricter limits in Makkah and Madinah.

Geographic eligibility and ownership rights

The Geographic Zones Document approved in June 2026 maps where non-Saudis may hold property and, zone by zone, which uses and which rights are permitted. Published legal and market commentary lists the giga-projects, including NEOM, The Red Sea, AMAALA and selected areas of AlUla, within the designated scope. The law is not limited to freehold: it allows ownership and other rights in rem, such as usufruct and easements, and the official map indicates any usufruct term and maximum foreign share per zone.

A common misunderstanding we see: “NEOM is in the zones, so I can own an apartment in The Line.” Inclusion of NEOM in the designated geographic scope does not establish that any specific apartment in The Line is on sale or registrable. Each parcel must be checked for its permitted use, the type of right available to your buyer category and whether a lawful seller exists.

The Saudi Properties application pathway

REGA operates the Saudi Properties portal as the official channel for non-Saudi ownership. The portal displays the approved zones on a map, explains ownership categories and accepts applications. Residents apply with their residency number; non-residents complete the digital identity step first. Under the regulations, financial transactions linked to the acquisition must pass through an electronic payment platform consistent with Saudi Central Bank (SAMA) payment rules.

Real estate registration and legal verification

Based on published analysis of Article 8 of the law, ownership by a non-Saudi becomes valid only once it is registered in the Real Estate Registry, which issues the electronic title. A signed contract without registration does not complete the acquisition. General regulatory guidance is available from the Real Estate General Authority, but the legal position of a particular property must be confirmed for that property.

  1. Confirm your buyer category: resident individual, non-resident individual, foreign company or Saudi company with foreign shareholders.
  2. Check the exact parcel on the Saudi Properties map, not only the city or project name.
  3. Identify the permitted use and right type for that zone: ownership, usufruct with a defined term or another right in rem.
  4. Obtain proof that the seller holds the right being sold or is a licensed developer authorised to sell it.
  5. Complete the eligibility application through the official portal before committing funds.
  6. Route payments only through approved electronic channels.
  7. Confirm the RETT position and any applicable non-Saudi fee with ZATCA rules and a tax adviser.
  8. Complete registration in the Real Estate Registry and obtain the electronic title deed.

Construction Progress and Delivery Risks

Construction announcements are frequently confused with housing delivery. Excavation, piling and infrastructure contracts are evidence of activity, but physical works on a site do not establish possession dates, rental income or a saleable residential product. The timeline below separates official statements from third-party reporting.

Date Event Source type
October 2017 NEOM announced with a USD 500 billion headline figure Official announcement
January 2021 The Line announced as NEOM’s linear city concept Official announcement
July 2022 Design unveiled: about 170 km long, 500 m high, nine million residents envisaged Official announcement
2023–2024 Large-scale excavation and piling reported, including work on the Hidden Marina segment Third-party reporting, satellite imagery
2024 Reports that the initial phase would be scaled to a much shorter segment Third-party reporting
2025 PIF reported to have commissioned a feasibility review of The Line Third-party reporting
January 2026 Reports of significant scaling back across NEOM, including Trojena and the 2029 Asian Winter Games arrangements Third-party reporting
May 2026 Webuild reported that NEOM had terminated a high-speed connector rail contract Company statement, as reported
July 2026 Coverage of a shift in NEOM’s public messaging; initial phase widely reported at about 2.4 km Third-party reporting
4 October 2026 Reuters, citing two sources, reported that the NEOM Stadium planned within The Line had been shelved indefinitely Third-party reporting; not officially confirmed

Original versus revised development expectations

The original ambition was a 170-kilometre city for nine million people. Reporting since 2024 describes a much smaller first phase, and 2026 coverage describes reprioritisation as Saudi Arabia focuses resources on commitments such as Expo 2030 in Riyadh and the 2034 FIFA World Cup. The October 2026 Reuters report concerned the proposed 46,000-seat NEOM Stadium, one of the announced 2034 World Cup venues. That report does not amount to an official cancellation of The Line itself, and NEOM’s own description continues to present The Line as part of its long-term vision.

What is physically delivered?

Based on our research, delivered and operating assets within the wider NEOM region include hospitality on Sindalah island and various support facilities. For The Line, the publicly reported evidence relates to earthworks, foundations and enabling infrastructure. We have not identified completed, occupiable housing in The Line offered to private buyers as of October 2026.

How delays affect cash flow

Delivery uncertainty has direct cash consequences. In an off-plan purchase, a buyer may pay a large share of the price before handover. If the schedule slips, capital is tied up without rental income, financing costs continue, currency exposure lasts longer and the investor’s exit options shrink. What this means for investors in practice: model cash flow on contractual milestones with enforceable remedies, not on promotional completion forecasts, and stress-test scenarios with delays of several years.

Our team view: the 2026 reporting does not tell us that The Line has ended, but it does tell us that timelines and scope are moving. For a private buyer, a moving target means the burden of proof sits even more firmly with the seller.

Earthmoving equipment and foundation works in a desert construction area

Off-Plan Contracts and Investor Due Diligence

If a residential product in The Line is ever offered to private buyers, it is likely to be sold off-plan first. Saudi Arabia regulates off-plan sales through REGA, and Wafi off-plan licensing is the regulatory programme under which developers must be licensed before selling units that are not yet built. The framework generally requires project registration, an escrow account for buyers’ payments and controlled release of funds against construction progress. These are general requirements; we have not identified any Wafi licence specific to residential sales in The Line.

Before paying any amount, an investor should work through the following ten steps with a Saudi-qualified lawyer:

  1. Verify the developer licence. Confirm the developer’s commercial registration and its current off-plan sales licence with REGA, including the specific project covered.
  2. Identify the legal seller. Establish whether the seller is the landowner, the developer or an intermediary, and obtain proof of its authority to sell.
  3. Identify the property precisely. Require the plot reference, building, floor, unit number, net and gross areas, and the official location within the designated zone.
  4. Check land and title status. Confirm who holds the underlying land right, whether it is encumbered and what right a non-Saudi buyer would receive.
  5. Confirm off-plan approvals. Request evidence that the sales documentation and payment plan are approved under the applicable off-plan rules.
  6. Confirm the escrow account. Ensure all payments go to the project escrow account named in the licence, never to a personal or unrelated company account.
  7. Review payment milestones. Link each instalment to verifiable construction stages, with independent progress reporting.
  8. Define handover conditions. Set a contractual handover date, specification, defects liability period and compensation for late delivery.
  9. Read default, refund and termination clauses. Check what happens if the developer delays, changes the design or abandons the project, and how deposits are refunded.
  10. Confirm dispute resolution and resale restrictions. Identify the competent court or arbitration forum, governing law and any limits on assigning the contract before handover.

Licensing and contract checks

A licensed developer and an approved contract are two separate tests. A developer can be properly licensed for one project and have no authority to sell units in another. We recommend checking that the licence number on the contract matches the specific project and phase, and that any change clause cannot unilaterally alter unit size, specification or delivery date without compensation.

Payment and protection checks

The payment schedule tells you how much risk you carry at each stage. A plan requiring large early instalments before visible construction transfers delivery risk to the buyer. Escrow protection only works when the funds actually reach the escrow account, so every transfer should be reconciled against bank statements.

Warning: any unofficial reservation, booking form, “priority list” fee or deposit request linked to The Line should be treated as high risk unless it is backed by an identified licensed developer, an approved off-plan licence and an escrow account. We have seen no basis for brokers claiming exclusive affiliation with The Line residential sales. Claims of insider allocation, discounts for early transfer or urgency deadlines are warning signs, not opportunities.

Foreign ownership, Vision 2030 projects and off-plan contracts all interact, and a short one-to-one review of your specific documents can save costly mistakes before any transfer is made.

If you have received an offer, a reservation form or a contract linked to NEOM or another Vision 2030 project, our team can review the eligibility and documentation questions with you before you pay.

Ask our research team a question on WhatsApp

Document review is only one part of the picture. The next question for any investor is whether the property can be financed, held and eventually sold at a reasonable cost.

Property consultant and buyer examining a residential development scale model

Financing, Holding Costs and Rental Returns

Financing for foreign buyers in Saudi Arabia depends on the lender’s own eligibility criteria. Relevant factors include residency status, income source and documentation, the property’s location, whether the project is approved and registered, and the type of right being acquired. As of October 2026, we have not identified any mortgage or home-finance product publicly available to foreign buyers for The Line. Residents may find financing options for completed, registered properties in established markets, but that does not transfer automatically to a giga-project with no residential inventory.

Lender limitations commonly include maximum financing-to-value ratios, minimum income thresholds, requirements for a registered title or approved off-plan project, valuation by an accredited valuer, and mandatory insurance. Non-resident borrowers typically face stricter conditions or no access at all. We recommend obtaining a written indicative offer for a specific property before relying on financing in any budget.

Holding cost What it covers Status for The Line
Service charges Building maintenance, common areas, security Unknown; no published schedule
Utilities and district cooling Electricity, water, cooling capacity charges Unknown
Insurance Building and contents cover, lender requirements Quotation required
Property management Tenant sourcing, rent collection, maintenance coordination No operating rental market evidenced
Furnishing and replacement Initial furnishing and periodic renewal Depends on handover specification
Taxation on income or disposal Home-country tax, any Saudi obligations, exit fees Adviser review required
Vacancy allowance Periods without rent No occupancy data

Credible rental yield calculations need four inputs: a real purchase price, actual operating expenses, comparable lease evidence and occupancy data. None of these exists publicly for The Line. For that reason, we do not publish a yield for The Line. The formulas below are for use once a genuine property and verified data are available:

  • Gross rental yield = annual contracted rent ÷ total acquisition cost × 100
  • Net rental yield = (annual rent − vacancy allowance − service charges − management − insurance − maintenance reserve) ÷ total acquisition cost × 100

A purely arithmetic illustration, unrelated to The Line: with a hypothetical total acquisition cost of SAR 1,120,000, hypothetical annual rent of SAR 70,000, an 8% vacancy allowance of SAR 5,600 and hypothetical operating costs of SAR 12,000, net income is SAR 52,400 and the net yield is about 4.7%. Change any input and the result changes; that is precisely why invented inputs produce meaningless yields.

Exit liquidity is the final test. Resale depends on a pool of eligible buyers, observable transaction prices, financing availability for the next buyer and any disposition fee on non-Saudi sellers. A new city without residents or a resale record carries higher liquidity risk than an established market with recorded transactions.

The Line Versus Alternative Saudi Investments

NEOM real estate investment in 2026 should be compared with alternatives on the same criteria. We use four tests: evidenced inventory, registrable rights for non-Saudis, confirmed operational stage and usable market comparables. Status labels are “verified”, “conditional” (depends on the specific property or requires current confirmation) and “unavailable”.

Location / project Evidenced inventory Registrable rights for non-Saudis Operational stage Market comparables
The Line, NEOM Unavailable Conditional — NEOM reported in zones; unit-level rights unconfirmed Enabling works reported; no occupiable housing evidenced Unavailable
Other NEOM areas (e.g. Sindalah, Trojena) Conditional Conditional Partly operational hospitality; other areas revised Unavailable for residential resale
Riyadh designated zones (established districts) Verified — active resale and new-build market Conditional — zone and right must be checked per property Verified — existing stock Verified — recorded transactions
Riyadh developments such as Diriyah or KAFD Conditional — confirm current sales releases Conditional Partly operational Conditional
The Red Sea and AMAALA Conditional — confirm current residential releases Conditional — reported in zones Partly operational resorts Limited

Which opportunities have evidence of active sales?

Riyadh has the clearest evidence of an active market: existing housing stock, new developments, recorded transactions and an operating rental market. Developments within the giga-projects and master-planned communities may release residential units, but each release should be verified against the developer’s licence and the Saudi Properties map at the time of purchase. Not every designated zone offers immediate public sales, and not every project in the news has buyable inventory.

Choosing between project exposure and a registrable property

An investor who wants exposure to NEOM’s long-term story and an investor who wants a registered home or rental asset have different needs. Project exposure may come through listed companies, funds or commercial ventures, with their own regulatory checks. A registrable property needs an identified unit, a lawful seller and a title. In our assessment, an investor whose priority is a documented, income-capable asset will currently find more evidence in established Riyadh or Jeddah zones than in The Line.

How to Evaluate a The Line Purchase

Can foreigners buy property in The Line? The honest answer is that eligibility may exist at zone level, but a purchase can only be evaluated when there is something specific to evaluate. The framework below leads from official verification to independent professional review.

  1. Establish your eligibility category under the Law of Real Estate Ownership by Non-Saudis.
  2. Check for actual official inventory from an identified, licensed developer.
  3. Identify the asset precisely, including parcel, unit and the right being offered.
  4. Confirm the zone, permitted use and right type on the Saudi Properties portal.
  5. Obtain a formal written price quotation and payment schedule.
  6. Model total acquisition cost, holding costs and conditional exit costs.
  7. Verify construction status, off-plan licence, escrow arrangements and contractual milestones.
  8. Secure independent reviews from a Saudi-qualified lawyer, a tax adviser and, where relevant, a licensed financial adviser.
  9. Decide to proceed, wait or stop based on the criteria below.

Go conditions: an identified licensed seller, an approved off-plan licence or completed title, a confirmed permitted right for your category, a written price, an escrow account and independent legal sign-off. Wait conditions: eligibility is clear but no official inventory exists, pricing is unpublished or delivery scope is still under review. Stop conditions: a request for a deposit without a licence, payments to personal accounts, claims of guaranteed returns, refusal to provide unit identification or pressure to transfer funds before documents are issued.

For most international readers as of October 2026, The Line falls into the wait category: worth following, not yet possible to price. That is not a negative verdict on NEOM; it is simply where the evidence stands. Investors who want to act now usually get better value from clarifying their goals, budget, preferred city and eligible property types first.

If you want to compare your investment goals and budget with property opportunities that can actually be verified in Riyadh, Jeddah or the designated giga-project zones, our short questionnaire is a practical starting point.

Get a free Saudi Arabia property consultation

We use your answers to check legal eligibility and to discuss only documented options. We do not claim access to The Line inventory, and we will tell you plainly if none exists.

Frequently Asked Questions About The Line

Can foreigners buy an apartment in The Line?

Saudi Arabia’s updated foreign-ownership framework allows eligible non-Saudis to acquire specified property rights in approved geographic areas, including reported coverage for NEOM. This does not establish that apartments in The Line are currently on public sale. Buyers must verify the specific property, permitted ownership right, developer authorisation and registration pathway through official channels before paying.

How much does an apartment in The Line cost?

As of October 2026, no independently verified official public apartment price list for The Line has been identified. NEOM construction budgets and forecasts are not residential selling prices. Any future purchase budget should begin with a genuine developer quotation and then account for applicable transaction tax, professional fees, registration, financing and ongoing ownership expenses.

Are The Line apartments available to reserve now?

The available research does not establish a verified public residential reservation programme for The Line as of October 2026. Marketing expressions of interest and NEOM investment announcements should not be treated as authorised apartment sales. Before transferring a deposit, request the specific unit details, seller credentials, applicable off-plan approval and enforceable reservation terms.

What taxes would I pay when buying property in Saudi Arabia?

Saudi Arabia generally imposes a 5% Real Estate Transaction Tax on taxable property disposals, subject to exemptions and the applicable rules (as of October 2026). A separate statutory provision permits a fee on certain non-Saudi dispositions, capped at 5%, but its actual applicability and amount must be confirmed. Buyers should also budget for documented legal, brokerage, banking and registration expenses.

When will The Line be ready for residents?

There is no reliable publicly confirmed date for completing the entire original 170-kilometre The Line vision. Construction preparation and development announcements do not establish possession dates for saleable homes. Reports during 2026 describe revised priorities and significant delivery uncertainty. Investors should rely on an identified project’s binding contractual milestones rather than promotional completion forecasts.

Is investing in The Line safer than buying in Riyadh?

The Line and established Riyadh property markets involve different levels of execution and liquidity risk. Riyadh offers existing property stock and observable transactions, while The Line lacks verified public residential price and sales evidence in the reviewed sources. Investors should compare legally available assets, verified costs, rental evidence, financing and resale conditions rather than assuming higher returns from a giga-project.

Conclusion

After reviewing the regulations, official project material and 2026 reporting, my team’s conclusion is straightforward: The Line remains an announced and substantially revised development, not a market where an international buyer can currently price and register an apartment. The legal door for foreign ownership in designated zones, including reported coverage for NEOM, opened in 2026. A legal door is not the same as a unit for sale.

The cost framework itself is clear and reusable. A taxable sale generally carries 5% RETT, with the economic burden set by contract; the Article 9 fee on dispositions by non-Saudis is capped at 5% and must be confirmed rather than assumed; and every professional, banking and registration cost needs a written quotation. Once a genuine, authorised unit exists, the formula in this guide will turn a quotation into a reliable budget.

Until then, my advice is patience combined with preparation: understand your eligibility, keep your capital away from unofficial reservations and compare The Line with Saudi properties that already have evidence behind them.

The Line Investment Decision: What to Verify

The verified position as of October 2026 is limited but precise. The non-Saudi ownership law has applied since 22 January 2026, the implementing regulations and Geographic Zones Document were approved on 23 June 2026, and NEOM is reported within the designated scope. An international investor cannot build a genuine The Line apartment acquisition budget until an authorised identifiable unit, a verified price, a permitted property right and the relevant fees are established.

Information that remains unavailable includes official apartment prices, an open sales or reservation programme, service charges, financing products, rental evidence and confirmed residential delivery dates. Before any payment, verify the seller’s licence, the parcel and right on the Saudi Properties portal, the off-plan approval and escrow account, the RETT allocation using ZATCA guidance, any non-Saudi fee, and registration in the Real Estate Registry. Rely on official project information published by NEOM itself rather than intermediaries’ claims. Announced plans and delivered assets must be treated as different categories in every decision.

Disclaimer: This article is general information prepared by Sophia & the Saudi research team as of October 2026. It is not personalised investment, legal, financial or tax advice, and it does not guarantee any availability, price, return, capital appreciation or completion date. Regulations, fees and project plans can change. Eligibility depends on the purchaser and the specific location. Consult a Saudi-qualified property lawyer, a qualified tax professional and an independently licensed investment or financial adviser before making any commitment.

Frequent questions

Содержание скрыть
Find the best properties - just fill out the form

    Get the top 7 facilities in Saudi
    Our contacts
    Terra Saudi
    Saudi Arabia
    Didn't find what you were looking for?
    Answer 4 questions - get a personalised selection of objects for you
    Start selection
    Didn't find what you were looking for?
    Get a ready-made catalogue of the top properties in WhatsApp or a customised selection according to your criteria